Typically, no. DHD works with a structural engineering firm as needed, and these costs are in addition to the fee charged by DHD. Upon request, DHD can provide a best guess estimate of what this charge may be.
Typically, no. DHD works with a structural engineering firm as needed, and these costs are in addition to the fee charged by DHD. Upon request, DHD can provide a best guess estimate of what this charge may be.